Skip to main content

Replace motors mechanism

In this document you will find a description how to replace the throw flaps motors system in the Smartb

 

You will need:

  • a new set of motors mechanism
  • a set of allen keys
  • cross screwdriver
  • trimmers
  • cutters

Before replacing disconnect device from the power supply!

With practice, some points can be omitted, but the simplest path will be described here


Step 1 Remove metal cover with shape 

  • Open door
  • Unscrew metal cover 
WhatsApp Image 2024-01-25 at 09.55.48.jpegWhatsApp Image 2024-01-25 at 09.56.02.jpeg


Step 2 Unscrew plastic flaps (optional)

  • this is just to have easier access to the motor plug and screw. Is not always necessary
WhatsApp Image 2024-01-25 at 10.41.45.jpegWhatsApp Image 2024-01-25 at 09.56.26.jpeg


Step 3 Unscrew led holder (optional)

  • this is just to have easier access to the motor plug and screw. Is not always necessary
  • Depending on the hardware version, the bolt may be from the front or rear
WhatsApp Image 2024-01-25 at 09.56.52.jpeg

WhatsApp Image 2024-01-25 at 11.05.23.jpeg


Step 4 Unplug motor cable

  • there is only one two-pin plug with a red and black cable
WhatsApp Image 2024-01-25 at 09.57.04.jpeg

 

WhatsApp Image 2024-01-25 at 10.03.45 (2).jpeg


WhatsApp Image 2024-01-25 at 09.57.33.jpeg




Step 5 SetUnscrew newmotor sensormechanism

Pay special attention to the direction! The beam has an arrow drawn on it. This arrow should point down and be on the opposite side of the mounting screws to the frame! (see photo below)
On the front of the device, the arrow should be on the left and on the back on the right.

  • firstthere placeare two Allen screws holding the beamsentire in their final positions
  • screw the first one (closer to the front door)
  • then the second one at the back similarly to the description (on the back it is on the other side)mechanism
20231117_0915451.jpgWhatsApp Image 2024-01-25 at 10.03.46.jpeg

WhatsApp Image 2024-01-25 at 09.58.00.jpeg



Step 6 SecureNow cableyou can replace with new mechanism and PCBassembly with zippersoposite direction


20231117_091525.jpgWhatsApp Image 2024-01-25 at 09.58.25.jpeg


Step 7 Plug in a new sensor


20231117_091935.jpg


Step 8 Screw flor again

The floor is not symmetrical! Orient it similarly to the others!

  h6WN2VgvyqWfRjB5-1.jpg


Step 9 Wieght calibration

Full calibration is required after load cell replacement. THIS IS A DIFFERENT CALIBRATION THAN ZERO CALIBRATION FROM THE MENU. Right now there is no possible full calibration from user menu.

Calibration consists of 4 stages
1. empty beam
2. load placed at the back
3. load placed in the middle
4. load placed at the front


pusta.jpg

kalibracja tyl.jpg

kalibracja srodek.jpg

kalibracja przod.jpg